Central government scheme
Scheme for Promotion of Culture of Science: Science Centre (Category-I, Category-II, Category-III)
- Nodal ministry
- Ministry Of Culture [1]
- Where
- All India
What is this scheme?
Financial assistance from the Government of India (as per scheme norms) to establish and support Science Centres of various categories, providing hands-on, experiment-based science learning. [2]
Subsidy, limits and fees
Not published: no subsidy %, limit or fee on this page could be traced to a quote in the cited official source.
Subsidy %, limits and fees, cited to the official notification, are on the full scheme page: open the full scheme page.
What are the benefits of this scheme?
- Under Type A funding, for Science Centres to be set up in locations/regions where Science Centre activities have not yet started, or in priority areas, the Ministry of Culture may consider providing full funding for such Centres through NCSM. In no case will more than one Science Centre be set up in any State/Union Territory in future under the scheme. In States/Union Territories where NCSM centres already exist, such provision shall not be applicable. [1]
- Under Type C funding, the State Government/Union Territory fully funds the project and sets it up with technical support from NCSM against payment of consultancy charges. [1]
- NCSM will complete the Science Centre on a turn-key basis, including construction and commissioning, and hand over the project after completion to the State Government/Union Territory. NCSM shall start the construction work only after the share of funding is received from the State/Union Territory Government. [1]
- the State Government/Union Territory shall do the construction of the building as per inputs from NCSM and develop the Science Park as per the advice of NCSM. NCSM shall provide technical and professional support at cost and consultancy charges to the State/Union Territory Government for the project. [1]
Show 2 more
- Decide the funding Type A (full funding from the Ministry of Culture), Type B (shared 50:50, or 90:10 for the North Eastern Region including Sikkim) or Type C (full State funding). [1]
- Construction under Type A and Type B, the National Council of Science Museums completes the centre on a turn-key basis and starts work only after the share of funding is received; under Type C, the State constructs the building as per its inputs. [1]
Who can apply for this scheme?
- The applicant should be a State Government, a Union Territory, or a Society/Authority promoted by the State/Union Territory Government. [1]
- The applicant proposing a Category 1 Science Centre should locate it in a city or town with a population of 15,00,000 or more. [1]
- The applicant proposing a Category 1 Science Centre should provide a minimum of 7.0 acres of land. [1]
- The applicant State Government/Union Territory should give a commitment to provide free land and funds as per norms. [1]
- The applicant should employ adequate professional staff for operation and management. [1]
Show 5 more
- The applicant should obtain all other statutory clearances and approvals required by the local authorities. [1]
- The applicant should choose the land in consultation with, and with the approval of, NCSM. [1]
- The applicant should ensure that the land is free from all encumbrances and encroachment. [1]
- The applicant should ensure that electricity, water, sewerage connection and telecommunication facility are available in the nearby vicinity. [1]
- The applicant should ensure that the land has good road connectivity for easy access and transport. [1]
How to apply for this scheme?
- Select the land in consultation with, and with the approval of, the National Council of Science Museums [1]
- Decide the funding Type A (full funding from the Ministry of Culture), Type B (shared 50:50, or 90:10 for the North Eastern Region including Sikkim) or Type C (full State funding) [1]
- Obtain the Detailed Project Report format at Annexure E, with Annexure E-1 for the Physical Report on Site [1]
- Prepare the Detailed Project Report, including the feasibility report, demand survey, commitment of land free of cost and recurring cost, projected footfall and expected revenue generation. An incomplete Detailed Project Report will render the application liable for rejection [1]
- Attach the mandatory documents, i.e., Copy of Registration, Memorandum of Association or Trust Deed, Letter of Support from State Government, Letter of Recommendation from District Authority, Authorisation Certificate, Commitments for space and operation, and Audited Statement of Accounts for last three years [1]
- Submit the proposal to the _Joint Secretary (Museums), Ministry of Culture, Government of India, Shastri Bhawan, New Delhi-110001_ [1]
- The proposal is considered on the basis of challenge method guidelines, as and when issued by the Government of India [1]
- The Detailed Project Report is appraised by the Project Appraisal Committee for recommendation to the competent authority [1]
- Obtain approval from the Government of India [1]
- Sign the Memorandum of Understanding with the National Council of Science Museums, if implemented by it [1]
What documents are required for this scheme?
- To design, develop and fabricate science museum exhibits, demonstration equipment and scientific teaching aids. [1]
- The corpus fund meets the operational deficit funding. The principal shall in no case be utilised for any activity. Not more than 85 per cent of the interest can be utilised to meet the operational deficit after inauguration, and a minimum of 15 per cent is to be added back to the corpus fund. [1]
- Prepare the Detailed Project Report, including the feasibility report, demand survey, commitment of land free of cost and recurring cost, projected footfall and expected revenue generation. An incomplete Detailed Project Report will render the application liable for rejection. [1]
- Attach the mandatory documents, i.e., Copy of Registration, Memorandum of Association or Trust Deed, Letter of Support from State Government, Letter of Recommendation from District Authority, Authorisation Certificate, Commitments for space and operation, and Audited Statement of Accounts for last three years. [1]
- Under Type B operational mode, State Governments/Union Territory administrations desirous of having more than one science centre, or wanting accelerated development of Science Centres, shall be given priority, provided they agree to bear the entire operating cost of the centre after it is developed and handed over to the States/Union Territories. [1]
Want help applying?
Tell us what you need. Our desk checks this scheme against your details and guides you through the paperwork.
Get help with this schemeOfficial sources
- myscheme.gov.in/schemes/spocs123Official source
- indiaculture.gov.in/scienceOfficial source
Compiled from the sources above; last updated 2026-10-29. Rules change: check the official portal before you apply.