Government scheme

PM-KUSUM (Solar for Farmers)

  • Subsidy / cost support
  • Loan
  • Credit guarantee

What is PM-KUSUM (Solar for Farmers)?

The consolidated MNRE guideline document is titled 'Guidelines for Implementation of New Scheme for Farmers for Installation of Solar Pumps and Grid Connected Solar Power Plants' (issued 17.01.2024). [1]

Key figures from the official source

Up to ₹10 lakh
Maximum loan
The most you can borrow under the scheme.
Source quoteQuantum: Minimum Rs. 25,000 / Maximum Rs. 10.00 lakhs; Repayment: Up to 120 months including moratorium; Interest rate: 1-Year MCLR + 350 bps [2]

Subsidy %, limits and fees, cited to the official notification, are on the full scheme page: open the full scheme page.

What are the benefits of PM-KUSUM (Solar for Farmers)?

  • Up to 40% advance CFA may be released on vendor award; balance CFA is released on completion and verification [3]
  • For PM-KUSUM Component B and Component C IPS in general states: Central CFA is 30%, State share is 30%, Farmer contribution is 10%, Bank loan is 30% [3]
  • For NE States, Sikkim, J&K, Ladakh, HP, Uttarakhand, Lakshadweep, and A&N Islands: Central CFA is 50%, State share is 30%, Farmer contribution is 10%, Bank loan is 10% [3]
  • Component C Feeder Level Solarisation CFA is capped at ₹1.05 crore per MW for general states and ₹1.75 crore per MW for special-category states [3]
Show 2 more
  • DISCOMs receive a Performance-Based Incentive of ₹0.40 per kWh or ₹6.6 lakh per MW per year (whichever is lower) for 5 years from COD to purchase power from farmer REPPs [3]
  • Component C provides reliable day-time solar power to farmers and lets them earn additional income by selling surplus solar power to DISCOMs. [4]

Who can apply for PM-KUSUM (Solar for Farmers)?

  • Individual farmers are eligible for all PM-KUSUM components and must be owner cultivators with land ownership proof certified by revenue authorities [3]
  • Farmer Producer Organisations (FPOs), cooperatives, panchayats, and Water User Associations (WUAs) are eligible for PM-KUSUM Component A [5]
  • Component A plants must be located on barren/fallow/pasture/marshland or on agricultural land in stilt fashion with adequate spacing between panel rows, within 5 km of a substation [3]
  • Component C Individual Pump Solarisation allows solar PV capacity up to 2 times the connected pump capacity in kW, with excess power sold to DISCOM [3]
  • Under Component A, the plant is installed by the farmer on his own land, directly or with a group of farmers/cooperatives/panchayats/FPOs/WUAs, or through a developer. [4]
Show 4 more
  • Component B supports individual farmers to install stand-alone solar pumps or replace diesel pumps in off-grid areas where grid supply is not available. [4]
  • Under Component B, priority is given to small and marginal farmers and farmers using micro irrigation. [4]
  • Component B pumps above 7.5 HP are allowed, but CFA is capped at the CFA for a 7.5 HP pump. [4]
  • In NER, hilly regions (J&K, Ladakh, Uttarakhand, HP) and islands, CFA is available up to 15 HP pump capacity, restricted to 10% of total installations. [4]

How to apply for PM-KUSUM (Solar for Farmers)?

  1. The scheme implementation deadline was extended to 31 March 2026 [3]
  2. In the state application flow (Telangana/TSREDCO example on the national portal), the farmer registers with their mobile number and a reference number is generated to log in [6]
  3. In the state application flow, the farmer fills the online form selecting Component-B and deposits the beneficiary-share amount to the state agency with transaction details [6]
  4. For Component A, the farmer must first execute a PPA with DISCOM before or during SIA processing; DISCOMs purchase power at FiT approved by the respective SERC [3]
  5. For Component B and C IPS, MNRE issues state-wise allocations after Screening Committee approval; farmers must apply through empaneled MNRE/state vendors [3]
  6. For a Component A application, RPGs submit a non-refundable processing fee that must not exceed Rs 5000 per MW (or part) of capacity applied for [4]
  7. Component B / Component C projects must be completed within 24 months from the date of sanction by MNRE [4]

What documents are required for PM-KUSUM (Solar for Farmers)?

  • Land ownership proof certified by revenue authorities is mandatory for all PM-KUSUM components, accepted formats include RTC, Patta, Khatauni, or land possession certificate [2]
  • Documents required for a Component B application (Telangana/TSREDCO example): land ownership/lease details, ID proof (voter ID/Aadhaar/driving licence), pattadar passbook/deed/registered sale deed, and a self-declaration by the farmer. [6]

Want help applying?

Tell us what you need. Our desk checks this scheme against your details and guides you through the paperwork.

Get help with this scheme

Official sources

  1. mnre.gov.in/en/notice/comprehensive-guidelines-for-implem…Official source
  2. sbi.bank.in/web/sbi-green/green-loans/agriculture/pm-kusu…Institutional source
  3. mnre.gov.in/en/pradhan-mantri-kisan-urja-suraksha-evam-ut…Official source
  4. cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/…Official source
  5. mnre.gov.in/en/pradhan-mantri-kisan-urja-suraksha-evam-ut…Official source
  6. pmkusum.mnre.gov.in/assets/pdf/Agencies component B/Telan…Official source
  7. agriinfra.dac.gov.in/Home/CheckListOfficial source
  8. canarabank.bank.in/pm-kusum-schemeInstitutional source
  9. indianbank.bank.in/en/ind-kisan-saur-shakthi-pm-kusum-add…Institutional source

Compiled from the sources above; last updated 2026-10-29. Rules change: check the official portal before you apply.