
State government scheme
Scheme for Assistance for Industrial Infrastructure-DNH&DD
- Nodal department
- Department of Industries [1]
- Implementing agency
- District Industries Centre [1]
- Where
- Dadra & Nagar Haveli and Daman & Diu
- Financial assistance
- Subsidy / cost support
What is Scheme for Assistance for Industrial Infrastructure-DNH&DD?
The scheme "Scheme for Assistance for Industrial Infrastructure" has been implemented by the Department of Industries, UT Administration of Dadra & Nagar Haveli and Daman & Diu. It aims to provide financial assistance for improvement of infrastructure in OIDC/Non-OI [1]
Subsidy, limits and fees
Not published: no subsidy %, limit or fee on this page could be traced to a quote in the cited official source.
Subsidy %, limits and fees, cited to the official notification, are on the full scheme page: open the full scheme page.
What are the benefits of Scheme for Assistance for Industrial Infrastructure-DNH&DD?
- Industrial infrastructure / investment assistance (capital and other incentives under the UT Investment Promotion Scheme) [2]
- up-to 50% of the project cost [1]
- Rs. 20 Crore per project [1]
- upto 100% assistance [1]
Show 2 more
- The Committee may consider undertaking specific studies for specific industries/ industrial areas/ industrial development activities through professional institutions/ reputed consultancy firms under the scheme, and expenditure for such studies will be incurred under this scheme. [1]
- In case there is no stakeholder for the development of the infrastructure of the industrial area/ estate, the Industries Secretary may appoint an agency to undertake a study on the requirement of critical infrastructure and submit it to the empowered committee for sanction of the project and to a [1]
Who can apply for Scheme for Assistance for Industrial Infrastructure-DNH&DD?
- The NA Conversion permission shall be accorded by the Competent Authority of the UT Administration for the Industrial Area [1]
- The NA permission shall have validity for the Industrial Area on the day of submission of the claim for assistance by the eligible Institution/Agency [1]
- The Industrial area land should have a valid layout plan permission from the Competent Authority, i.e., Planning Authority, as per UT's DCR [1]
- The minimum area of land for the scheme shall be 25000 sq. m. for new products [1]
- a) Approach the road from the industrial estate/ area to the Highways/ MDR [1]
Show 5 more
- b) Upgradation of existing roads/widening of roads [1]
- c) Water/ Gas/electricity/energy distribution networks [1]
- d) Transport Nagar / Transport facilities, Water Augmentation Facility [1]
- e) Any other infrastructure facilities as approved by the Implementation [1]
- f) Any other infrastructure as defined in DCR of Planning & Zoning [1]
How to apply for Scheme for Assistance for Industrial Infrastructure-DNH&DD?
- Apply through the UT EODB Single Window Portal (swp.dddgov.in); units submit required information to the District Industries Centre [2]
- The eligible institutions will apply with a project report to the Department of Industries, Dadra & Nagar Haveli and Daman & Diu [1]
- The Department of Industries will scrutinize the proposal with the consultation of the Chief Engineer, PWD/OIDC and the Finance Department on Technical & Financial aspects of the project and then place it before the empowered Committee for decision [1]
- Assistance will be released at the following stages [1]
- 25% after completion of 25% work progress [1]
- 50% after completion of the project [1]
- Final payment will be made on completion of Project & Physical verification of the Engineer of UT's Administration and production of the Completion certificate issued by an authorised third-party agency [1]
- UT Administration has the right to change, withdraw or modify the scheme fully or partially at any stage [1]
What documents are required for Scheme for Assistance for Industrial Infrastructure-DNH&DD?
- Application Form [1]
- Copy of the Constitution or Establishment of the Institute/Company (Registration Certificate). [1]
- Note on justifying the criticality of required infrastructure and industrial area to be covered/benefited. [1]
- Detailed Project Report with funding pattern, detailed cost estimates of Infrastructure should be prepared on the basis of S OR (Schedule of Rates) declared by UT Administration of Daman & Diu and Dadra & Nagar Haveli. [1]
- Layout plan of the project indicating the beneficiary units in the Map. [1]
- If finance from other sources has been tied up, then submit Confirmation letter of the institution/bank/other source (Please include financing pattern). [1]
Want help applying?
Tell us what you need. Our desk checks this scheme against your details and guides you through the paperwork.
Get help with this schemeOfficial sources
- myscheme.gov.in/schemes/aiisOfficial source
- nsws.gov.in/portal/approval-details/dadra-and-nagar-havel…Official source
Compiled from the sources above; last updated 2026-10-29. Rules change: check the official portal before you apply.