Central government scheme
AICTE - Grant For Augmenting Infrastructure In North Eastern Region
- Nodal ministry
- Ministry of Education [1]
- Where
- Arunachal Pradesh, Assam, Manipur, Nagaland, Tripura, Meghalaya, Mizoram, Sikkim
- Financial assistance
What is AICTE - Grant For Augmenting Infrastructure In North Eastern Region?
The Scheme is being implemented through the Indian Institute of Technology– Guwahati [1]
Key figures from the official source
₹20 lakh
Financial assistance
Paid to you: not a loan, nothing to repay.
Subsidy %, limits and fees, cited to the official notification, are on the full scheme page: open the full scheme page.
What are the benefits of AICTE - Grant For Augmenting Infrastructure In North Eastern Region?
- Water harvesting projects are supported under the Scheme for assured water even during the dry season [1]
- The scheme makes the provision of installations for captive solar power energy; at places where the solar energy is not effective, procurement of generators can be considered [1]
- To mitigate this problem, funding for setting up an initial internet connection is considered under the Scheme [1]
- e, 20% reimbursed after completion; some sources cite up to Rs. 20 lakh. If project not initiated within six mo [1]
Show 2 more
- Limit of Funding: ₹ 15,00,000 [1]
- The scheme "AICTE - Grant for Augmenting Infrastructure in North Eastern Region (GAINER)" was introduced by AICTE to enhance the functional efficiency of the technical institutes located in far-flung areas of North East India, by addressing deficiencies in water, electricity, and internet. [1]
Who can apply for AICTE - Grant For Augmenting Infrastructure In North Eastern Region?
- a. Government/ Government-aided technical/ engineering colleges/University Departments including Polytechnic Institutes of North East are entitled to the grant. [1]
- b. The institute must be in existence for the last five years. [1]
- Scheme implemented through IIT Guwahati across 23 institutions to resolve water, electricity and internet connectivity deficiencies. [1]
How to apply for AICTE - Grant For Augmenting Infrastructure In North Eastern Region?
- Download and fill out the application form for AICTE-Grant for Augmenting Infrastructure in North Eastern Region (GAINER) [1]
- Verify that every page of the application form has the signature and stamp of the Head of the Institute [1]
- Attach all the essential documents along with the filled application form [1]
- Kindly ensure all the information is correct and then sent the Application form along with all the essential documents through registered post/speed post to: [1]
- A. Submission of application by the institute [1]
- B. Screening/ scrutiny of applications at Council [1]
- C. Evaluation of applications by the expert committee [1]
- D. The final decision will be taken by the Council, keeping in view the recommendations made by the experts and the availability of funds for the scheme [1]
- E. After the Council’s approval, the Sanction Letter and the first installment of funds for the Project will be sent to the institution [1]
What documents are required for AICTE - Grant For Augmenting Infrastructure In North Eastern Region?
- A. Plan/detailed estimates of the project [1]
- B. Abstract of the estimates of the project [1]
- C. PWD/CPWD rate certificate of the project [1]
- D. Conformity with the norms as suggested by the AICTE and the rates are as per CSR of the region. [1]
- E. Mode of construction viz. Contract/ Departmentally (at most competitive rates) or Deposit work by the PWD. [1]
- F. A certificate from the Principal/ Competent Authority (concerned Secretary, State Government for Technical Education) that expenditure over and above AICTE grant, if any, will be met by the Stat... [1]
Show 6 more
- Terms and Conditions [1]
- A. Annual Progress Report should be submitted in respect of the projects. [1]
- B. After completion of the project, a Project Completion Report should be submitted. [1]
- C. Utilization Certificate and Statement of Accounts in prescribed proforma, duly audited by the Finance Officer/Account Officer has to be submitted to AICTE before claiming the balance amount as w... [1]
- Procurement of Solar power energy equipment/Generator/Internet connection [1]
- A. Documentary proof of cost etc. along with the purchase procedure/formalities to be adopted as per the prescribed order formalities indicated in the GFR. [1]
Official sources
- myscheme.gov.in/schemes/a-gainerOfficial source
Compiled from the sources above; last updated 2026-10-29. Rules change: check the official portal before you apply.